Polaris UTV, SkyJack Lift and more heavy equipment at 365 Equipment & Supply

Plan Ahead for Busy Construction Seasons

Infrastructure projects are often scheduled months in advance, so it’s important to think about equipment availability early, too. Stay on schedule by reserving equipment ahead of time, when you have more options for the machines and delivery dates your project requires.

Large projects may require multiple machines to arrive at the same time, so coordinate equipment and delivery schedules so everything is ready when each phase of work begins. Planning those details early can make it easier to keep crews, equipment, and project schedules moving together.

Before a busy project gets underway, 365 helps contractors line up the equipment they need, like:

  • Telehandlers
  • Forklifts
  • Skid Steers
  • Boom Lifts
  • Scissor Lifts
  • Excavators
  • Backhoes
  • Wheel Loaders
  • Compactors
  • Rollers

Tell Us Your Heavy Equipment Needs, and We'll Make It Happen!

Just fill out the form, and we’ll get in touch shortly to assist you. Prefer to call instead? Reach our team at 847-756-3807.
  • MM slash DD slash YYYY

Featured Heavy Equipment for Infrastructure Projects

Our rental fleet includes equipment for material handling, elevated work, transportation, and other work common on large construction and infrastructure projects.

Polaris UTV

Reliable jobsite transportation for moving crews, tools, and materials quickly across large or multi‑zone projects. Keeps workflow moving without tying up larger machines.

Genie BOOM LIFT – 40-45′ ARTICULATING

Boom Lift – 40–45′ Articulating

A versatile articulating boom ideal for exterior building work, overhead installs, and multi‑trade tasks where crews need both height and horizontal reach.

R25 Rolling Platform

RP25 Rolling Platform

A stable rolling work platform for elevated tasks that require wide deck space, mobility, and secure footing — ideal for interior construction, mechanical installs, and finishing work.

S740 SKID STEER (T4F) 8,800LB

S740 Skid Steer (T4F) 8,800 lb

A compact, high‑power machine for grading, digging, cleanup, and material handling. Versatile across tight or congested jobsites.

SKYJACK 3219 / 3220 SCISSOR LIFT

Skyjack 3219 / 3220 Scissor Lift

A dependable scissor lift providing a stable platform for crews working at consistent heights. Ideal for electrical work, interior installs, and overhead finishing tasks.

323F EXCAVATOR T4F 56,200 LB

323F Excavator (T4F) 56,200 lb

A production‑ready excavator for trenching, foundation digging, and heavy earthmoving. Strong choice for infrastructure projects requiring dependable digging power.

Bobcat Skid Steer

Equipment Worth Reserving Early

Some equipment is especially worth lining up early when a project requires specific lift heights, capacities, or site access.

  • Material Handling: Reserve telehandlers when projects require moving heavy materials around active jobsites, especially when reach and lifting capacity are important to the work.
  • Elevated Access: Boom lifts and scissor lifts give crews options for overhead work, with different machines suited to different heights, reach requirements, and jobsite conditions.
  • Transportation Around Large Sites: UTVs help crews move people, tools, and materials across larger jobsites without pulling bigger machines away from the work that needs them.

Why Contractors Reserve Equipment Early

Whether you’re planning a last-minute project or something scheduled months in advance, staying on schedule matters for your budget, timeline, and reputation as a contractor. But many factors can complicate this, like coordinating crews, equipment, deliveries, and different phases of work across multiple jobsites. When the right equipment isn’t available at the right time, one delay can affect everything that follows.

Reserving equipment early gives contractors more time to work machinery into the project schedule. Partnering with a rental team that has access to a large fleet makes it easier to manage equipment needs across multiple jobs instead of piecing together rentals from several suppliers. Having the equipment lined up before work begins gives your team one less scheduling issue to solve once the project is underway.

Early reservations help contractors:

  • Keep projects on schedule and within budget
  • Avoid downtime caused by equipment shortages
  • Simplify logistics across multiple jobsites
  • Strengthen reliability and client trust
SkyJack Lifts
Keep Your Projects Moving – No Downtime, No Delays

The 365 Advantage

365 Equipment & Supply connects contractors to a ready-to-roll rental fleet backed by a team that understands tight schedules and job-site pressure. Whether you’re planning ahead or solving a mid-project gap, our experts match you with the right equipment fast so your crew stays productive.

Call our team at 847-756-3807 to talk through your next project’s needs. We’ll help you choose the right machines, confirm site compatibility, and lock in availability before demand spikes.

When your current fleet can’t cover the next job, 365 will help you fill the gap, fast and hassle-free.